1-Q: Who is responsible of preparing the project time schedule and in which phase?

A: It’s the contractor’s responsibility after signing the contract. The schedule
           should cover all project activities along with the a provisional items in  
            logical sequence including start and end date

2-Q: Can you provide us with the rate / meter2 for the Skelton?

A : Our pricing policy in MIRAS NATIONAL based on providing the client with a price that reflects the actual project value after studying and reviewing all the documents such as architectural and structural drawing , B.O.Q and specifications the rate / m2 is not within our policy.

3-Q: Do you execute villas ?

A: Yes we do
          Actually we do executed all project types it will be a great honor if you
           contact us to set for a meeting and discuss all your requirements.

4-Q : What services your company provides ?

A: 1- Civil Engineering Works

        2- Project’s Management

        3- Electrical Works

       4- Mechanical Works

       5- Interior design Works

       6- Maintenance Works

5-Q: What is the difference between the Bid Bond and the Performance Bond?

A: Bid Bond: is submitted by all bidders within the bid documents to ensure
        seriousness, mostly it doesn’t exceed 5 % of the bid value.

       Performance Bond: is submitted by the winner contractor after signing the
         contract to ensure the best performance.

6-Q Do you prefer to assign the design and supervision to the same party or no?

A: The preference is to assign them both to the same party for the following reasons:  

  • To avoid scattering responsibility.
  • To recover the design defects during the supervision phase and under his umbrella.

7-Q: Who is the responsible for design defects?

A: The designer is responsible for the design defects, the designer may be the owner, the contractor or the consultant.

8-Q: Can any contracting company receive project limits?

  A: Yes, but the company has to be classified in Kuwait Municipality.  

9-Q: Does the architectural design within your service?

A: No, We only execute projects starting from receiving the limits, executing the
        civil and electromechanical works and finishes till the project completion.

10-Q: In your point of view if you were owner which type of contract do you prefer to sign it with the contractor?

A: Lump sum contract.

[contact-form-7 id=”1769″ title=”faq-form”]

Contact Us

 Miras National Company For General Contracting and Construction .

Head Office

Sharq – Block 7- Al shuhada street – Tower 50 – 4th floor

Business Hours

Saturday to Thursday 08:00 AM – 04:00 PM

Contact Information

Tel

+965 22218882
+965 22218889
+965 98886464

Fax

+965 22219289

E-mail

info@mirasnational.com

P.O.Box

13048 Safat, 4738 Kuwait

Copyrights© 2019 Mirasnational . All Right Reserved.

Follow Us


Facebook-f


Twitter


Instagram


Linkedin