1-Q: Who is responsible of preparing the project time schedule and in which phase?
A: It’s the contractor’s responsibility after signing the contract. The schedule
should cover all project activities along with the a provisional items in
logical sequence including start and end date
2-Q: Can you provide us with the rate / meter2 for the Skelton?
A : Our pricing policy in MIRAS NATIONAL based on providing the client with a price that reflects the actual project value after studying and reviewing all the documents such as architectural and structural drawing , B.O.Q and specifications the rate / m2 is not within our policy.
A: Yes we do
Actually we do executed all project types it will be a great honor if you
contact us to set for a meeting and discuss all your requirements.
4-Q : What services your company provides ?
A: 1- Civil Engineering Works
2- Project’s Management
3- Electrical Works
4- Mechanical Works
5- Interior design Works
6- Maintenance Works
5-Q: What is the difference between the Bid Bond and the Performance Bond?
A: Bid Bond: is submitted by all bidders within the bid documents to ensure
seriousness, mostly it doesn’t exceed 5 % of the bid value.
Performance Bond: is submitted by the winner contractor after signing the
contract to ensure the best performance.
6-Q Do you prefer to assign the design and supervision to the same party or no?
A: The preference is to assign them both to the same party for the following reasons:
- To avoid scattering responsibility.
- To recover the design defects during the supervision phase and under his umbrella.
7-Q: Who is the responsible for design defects?
A: The designer is responsible for the design defects, the designer may be the owner, the contractor or the consultant.
8-Q: Can any contracting company receive project limits?
A: Yes, but the company has to be classified in Kuwait Municipality.
9-Q: Does the architectural design within your service?
A: No, We only execute projects starting from receiving the limits, executing the
civil and electromechanical works and finishes till the project completion.
A: Lump sum contract.
[contact-form-7 id=”1769″ title=”faq-form”]
Contact Us
Miras National Company For General Contracting and Construction .
Head Office
Sharq – Block 7- Al shuhada street – Tower 50 – 4th floor
Business Hours
Saturday to Thursday 08:00 AM – 04:00 PM
Contact Information
Tel
+965 22218882
+965 22218889
+965 98886464
Fax
+965 22219289
info@mirasnational.com
P.O.Box
13048 Safat, 4738 Kuwait
Copyrights© 2019 Mirasnational . All Right Reserved.